Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Lower Monumental Bulkhead

Scroll
Lower Monumental Bulkhead
(01)
Synopsis

overview

Solid Design and Detail was hired for the modeling and detailing for the new Penstock Bulkhead at Lower Monumental Dam. This was an infrastructure improvement project that will help regulate the Columbia River’s flow and power generation for decades to come.

(Details)
Date
October 1 2023
Industry
Infrastructure
Services
Complex Fabrication Design—Mechanical Design
No items found.
(02)
Objective

project Scope

SDD supported the 3D design and detailed this project in its entirety. This included complete 3D BIM Models, Shop Drawings, Assembly and Erection Drawings, Bill of Materials and .DXF files to CNC all steel plates.

No items found.
(03)
Results

Outcome

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat. Autem vel eum iriure dolor in. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat.